Flow Assurance 2010

  • 26-28 Jan 2010
  • Marcliffe Hotel, Aberdeen, United Kingdom

Description

Implement flow assurance strategies to reduce deposit build up, maintain pipeline integrity and optimise flow efficiency

The efficient operation of pipelines transporting liquid or gaseous hydrocarbons is crucial. In order to main profitable levels of production, disruptions to the rate of flow must be kept to a minimum.
The 2010 Flow Assurance 2010 conference will focus on ways of preventing and controlling the deposit build up that can lead to pipeline blockages and the corrosion of materials.
Your expert speaker line up will show you how to:
  • Manage wax build up in pipelines through chemical injection
  • Avoid pipeline friction and increase flow through slugging techniques
  • Accelerate flow through the implementation of scale inhibitor treatments
  • Minimise hydrate formation through use of thermal management strategies
Plus ! Compliment your knowledge with 2 post-conference workshops:
  • Workshop A Analyse the techniques available to avoid slug formation
  • Workshop B Active severe slugging control for offshore oil production systems

Past Events

Important

Please, check "Flow Assurance" official website for possible changes, before making any traveling arrangements

Event Categories

Industry: Construction & Building

Other Events with Similar Categories

Other Events with Similar Location or Organizer

Featured Conferences & Exhibitions