Reduce Inspection Costs with Sequential Sampling in ANSI/ASQ Z1.4 2016

  • 08 Jun 2016
  • Webinar

Description

Topics
  • The operating characteristic curve, and the points (AQL, 1-alpha) and (RQL, beta) where the second item is the chance of acceptance. (An ANSI/ASQ Z1.4 plan does not have a specified RQL, but we must determine one based on beta = 0.10, which is tabulated in the standard, so we can create the sequential plan)
  • Specification and selection of an ANSI/ASQ Z1.4 sampling plan
  • Demonstration that the sequential plan provides comparable protection from poor quality, and in fact identical protection at (RQL, beta)
  • Determination and tabulation, in a very convenient format, of a sequential sampling plan
  • Application of the ANSI/ASQ Z1.4 switching rules
  • Average sample number (ASN), the number of items we expect to have to inspect to decide whether to accept or reject the lot
Who should Attend

Attendees from:

  • All manufacturing industries that use ANSI/ASQ Z1.4
  • Quality managers, engineers, and technicians

Past Events

Important

Please, check "Reduce Inspection Costs with Sequential Sampling in ANSI/ASQ Z1.4" official website for possible changes, before making any traveling arrangements

Event Categories

Business: Quality assurance
Industry: Construction & Building, Energy & Utilities
Technology: Industrial technology

Other Events with Similar Categories

Other Events with Similar Location or Organizer

Featured Conferences & Exhibitions