Underground Transmission 2015 is a conference dedicated to This conference will engage attendees in examples of recent underground projects, technologies, challenges and lessons learned.
Topics
- Tampa Electric`s challenges and benefits to undergrounding
- Southern California Edison`s challenges with the first 500kv underground project in the United States
- The challenges encountered during the installation of 230 kV underground cable
- Methods for testing high voltage and extra high voltage cables
- The Newark Energy Center 230 kV underground interconnection project
- XLPE pipe-type cables, accessories and transition joints for connecting old with new cables
- The challenges facing underground transmission
- Northeast Utilities Stamford Reliability Cable Project
- Considerations to an underground project in soils with low thermal resistivity