Artificial Lift Methods is a workshop dedicated to gas Lift, Reciprocating Rod Lift, Progressive Cavity Pumping (PCP), Hydraulic Pumping (HP), etc.
Topics
- Reservoir Perfomance IPR & OPR
- Oil Field Production System
- Gas Lift (GL)
- Why & When Artificial Lift is Required?
- Progressive Cavity Pump (PCP)
- Sucker Rod Pump (SRP)
- Hydraulic Pump (HP)
- Electric Submersible Pump (ESP)
- Plunger System
- Jet Pump (JP)
- Capillary System
Who should Attend
Attendees with job titles such as:
- Field Operations Engineers with 0-10 Years Experience
- Production Engineers with 0-10 Years Experience
- Geoscientists with 0-10 Years Experience
- Operators with 0-10 Years Experience
- Petroleum Engineers with 0-10 Years Experience
- Reservoir Engineers with 0-10 Years Experience